A Elmstead company - serving Mesquite, NV
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Bunkerville, NV

Bathroom Remodeling in Bunkerville - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Permits handled, and the local pro we connect you with is licensed and insured.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Mesquite
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled primary suite with built-in wardrobes and a window seat
A garage converted into a guest room and home office
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Bunkerville

If you’re planning a bathroom remodel in Bunkerville, NV, the work usually runs $9,000 – $28,000 for a full room and $5,000 – $12,000 for a small one, with a written price in hand before anything gets torn out. We work on the older ranch homes and owner-built houses off the Virgin River corridor, and we know what’s behind those walls is rarely what the last remodel left behind. That matters more here than in a new subdivision. When you’re ready to talk, call (833) 620-6606 and a live person picks up, day or night.

Call (833) 620-6606

Why Elmstead Remodeling Mesquite Is Bunkerville’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

Bunkerville is small enough that a reputation here travels fast, and ours is built on how we leave a house, not just how the tile looks when we’re done. Families with kids and pets hire us because we put down drop cloths and shoe covers on every visit, ask before we move anything, and run quiet tools during nap and school hours where we can. That’s the Cedarwell Care Promise in plain terms.

The 365-Day Done Right Promise backs every completed project. If something isn’t right after we’ve finished, we make it right, and that commitment is stamped on the job. Every price we give is written before work starts, so the number you approve is the number you pay.

We answer the phone 24/7 with an actual person, not a voicemail box. And because Bunkerville sits off the beaten path, we plan the schedule around the drive and the heat rather than pretending it’s a quick city trip. Our technicians have up to 21 years of experience, and that shows most when a wall comes open and the framing isn’t square. Call (833) 620-6606 for a free estimate.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Small Bathroom Remodel in Bunkerville

A Small Bathroom Remodel in Bunkerville often means working inside a compact footprint in one of the settlement-core homes or mid-century ranches, where every inch gets used and the plumbing stack can’t move far. The job usually covers a new vanity, a refreshed shower or tub surround, updated waterproofing, tile, and fixtures, done in a tight space without turning the rest of the house upside down. Homeowners here call us when the room is dated, the floor feels soft near the tub, or a single bathroom has to serve a growing family. A typical small remodel in Bunkerville runs $5,000 – $12,000, and a new vanity on its own is $800 – $3,000. We give you the line-item price in writing before we start.

Working inside a tight footprint

Small rooms leave no room for a sloppy layout. We measure the actual clearances and plan the fixture placement so a new Kohler or Moen shower valve and trim don’t crowd the door swing. Where the framing is out of square, we fix it rather than hiding it behind a thicker tile bed.

Keeping the rest of the house usable

Most Bunkerville households don’t have a spare bathroom to fall back on, so we sequence the work to keep water and a toilet available as long as possible. Drop cloths go down on the path through the house, and we clean up before the crew leaves each day.

Shower Remodel in Bunkerville

A small remodeled galley kitchen with cabinets to the ceiling

A Shower Remodel in Bunkerville usually starts with a surround that was tiled directly over drywall or a pan that’s leaked quietly for years, and the fix is proper waterproofing, a solid substrate, and a shower that drains the way it should. Homeowners here call us when the caulk keeps failing, the grout won’t stay put, or they’re ready to swap a tub for a walk-in. Walk-in shower installation in Bunkerville runs $4,500 – $12,000, a tub-to-shower conversion is $3,500 – $10,000, and a shower replacement alone is $3,000 – $8,500. We price the waterproofing and substrate work up front so there’s no surprise when the old pan comes out.

Waterproofing that holds up

The pan and walls are where showers fail. We use modern waterproofing systems, and if the subfloor under the old pan has softened from years of slow leaks, that repair gets priced in writing before we close the walls back up. Getting this right the first time is why the leak doesn’t come back next season.

Glass, tile, and fixtures

A frameless glass enclosure opens up a small Bunkerville bathroom without adding square footage. We set tile on a flat, properly cured substrate and hang Kohler or Moen fixtures you can look up by name, with manufacturer warranties that travel with the finished shower.

Trusted Brands We Service in Bunkerville

When you pick materials for a Bunkerville bathroom, we work with names you can research and whose warranties follow the finished room. Cabinets come from KraftMaid and Wellborn, countertops from Silestone and Caesarstone, and fixtures from Kohler and Moen. You can read the spec sheets and the warranty terms yourself before you commit, which is the point. We don’t stock parts locally and we won’t claim to, but ordering through our material partners keeps turnaround reasonable even out here on the river. If a brand matters to you, tell us and we’ll build the quote around it.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Bathroom Remodeling Problems We See in Bunkerville Homes

  • Leaks that return within a season. Old showers tiled over failed waterproofing and a soft subfloor keep leaking until the pan and substrate are redone properly, not just re-caulked. We fix the cause before new tile goes down.
  • Framing and wiring found only after demolition. Older settlement-core homes often hide undersized framing and outdated wiring that a Clark County inspector won’t sign off on. We inspect first and price any concealed repair in writing before the drywall closes.
  • Heat-timed failures. Scheduling rough-in and inspection sign-off during 110°F-plus summer afternoons can cause thinset, grout, or stucco patch failures. We plan the work around the heat so curing happens when it should.
  • Foundation surprises near the historic core. In Bunkerville’s 1800s settlement core, opening a wall or digging near the slab can turn up original acequia-era ditch lines or water-rights easements that never show on a Clark County plat.

Pricing for Bathroom Remodeling in Bunkerville, NV

Bathroom remodeling in Bunkerville runs $9,000 – $28,000 for a full room and $5,000 – $12,000 for a small one. What moves the number is what’s behind the walls: concealed wiring, undersized framing, failed waterproofing, and the code upgrades a permit triggers once the room is open. We inspect first, write allowances into the contract, and price any real surprise in writing before we touch it, so the quote doesn’t grow after the crew arrives. Every estimate is free and every price is written before work starts. Call (833) 620-6606 to schedule yours.

Service Typical Bunkerville Range
Bathroom Remodel $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Shower Replacement $3,000 – $8,500
Bathroom Vanity Installation $800 – $3,000

We Also Serve Cities Near Bunkerville

We also take on bathroom projects outside town, including Mesquite, Moapa Valley, and Moapa Town. The same written pricing, background-checked technicians, and clean-up standards apply wherever the job is. If you’re just outside Bunkerville and wondering whether we’ll travel to you, call and ask. We’ll tell you straight.

Serving Bunkerville, NV – Our Local Coverage Area

We serve Bunkerville and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Bathroom Remodeling in Bunkerville

Why Bunkerville Chooses Elmstead Remodeling Mesquite

We set the standard for bathroom remodeling in Bunkerville.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Bunkerville

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Bunkerville Customers Say

Trusted by homeowners across Bunkerville and surrounding areas.

★★★★★

"Two bathrooms done at once with kids and a dog in the house. They kept dust contained, were gentle with the pets, and left the place clean each day. Calm and careful."

Paige Lindholm
★★★★★

"Kitchen remodel with two kids home. They walled it off in plastic and cleaned every day. Calm, respectful crew and the result is gorgeous."

Priya Venkataraman
★★★★★

"Kitchen remodel. With two kids at home I was dreading the dust, but they walled off the space in plastic and cleaned every single day. Respectful, calm crew. The kitchen is stunning."

Beverly Austin

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A home office with a built-in desk and shelvesA remodeled kitchen with a waterfall island and wood cabinetsAn open living space after a whole-home remodelA finished backyard cottage with a small covered porchA galley kitchen opened up to the dining room with a new peninsulaA remodeled family room with new windows and a window seat

More remodeling services in Bunkerville

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Elmstead in Mesquite

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Mesquite team

A local vetted partner works across Mesquite and the towns around it, to the same written standard as every Elmstead job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Bunkerville?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Bunkerville.

(833) 620-6606

Request a Free Estimate in Bunkerville

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch