A Elmstead company - serving Mesquite, NV
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
KraftMaid · Mesquite

KraftMaid Kitchen Remodeling in Mesquite, NV

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Mesquite
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A second-story addition that matches the existing roofline
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

KraftMaid Kitchen Remodeling in Mesquite: What to Know First

KraftMaid kitchen remodeling in Mesquite usually runs $14,000 to $45,000 for a full kitchen, $9,000 to $20,000 for a smaller or partial remodel, and cabinets alone land between $4,000 and $13,000, depending on door style, box construction, and whether we’re installing new or refacing what you have. Most full kitchens take three to six weeks once materials are on site, and that timeline starts with a written price, not a verbal one.

Call (833) 620-6606

This page is for homeowners in Mesquite who already have KraftMaid cabinets, or who are planning a KraftMaid kitchen and want to understand what goes into the job. If that’s you, call (833) 620-6606 for a free estimate. Bring photos and measurements if you have them; we’ll walk the space with you either way.

How KraftMaid Products Fail – and How We Fix Them

Installers leveling a new base cabinet during a kitchen remodel

KraftMaid builds a solid cabinet, and the failures we see in Mesquite are usually about climate, moisture, and the way a kitchen gets used, not manufacturing defects. Here are the patterns that come up most often in this valley.

  • Door and drawer-front warping on painted maple and oak lines. Our summers swing from dry heat into monsoon humidity, and painted finishes on flat-panel doors can show hairline separation at the joints when they cycle through that repeatedly. We look at the hinge side first, because that’s where the swelling shows up before the face cracks. Fix: re-square the box, replace the affected fronts with OEM-matched panels, and address the humidity source before anything goes back on.
  • Sagging drawer bottoms in the middle of a wide bank. Heavy cookware plus a particleboard or thin plywood bottom, over years, produces a bowed base that catches on the frame. A lot of KraftMaid lines use a captured bottom that’s easy to re-seat. When the bottom is past saving, we upgrade to a thicker plywood replacement and re-hang the slides.
  • Loose and stripped hinge plates on framed cabinets. Frameless boxes take knocks better here, but face-frame hinges loosen when a plate is screwed into a strip that’s been opened and closed a thousand times. We reset the plate into fresh wood, or move to a different hinge position, rather than relying on a bigger screw.
  • Delaminating laminate countertops over KraftMaid base cabinets. The cabinets themselves may be fine while the laminate top has lifted at the sink or seam. Mesquite’s dry air dries out the adhesive layer where moisture used to sit. We solve this with a quartz or natural-stone top matched to the cabinet height, from Cambria or Silestone, so the cabinet doesn’t have to be touched.
  • Corner and toe-kick gaps after a partial remodel. When a homeowner adds an island or changes a run, the existing KraftMaid line might have been discontinued or renamed. As an independent KraftMaid service provider, we match color and profile as closely as possible, or build a small custom return to bridge the difference, rather than leaving a visible seam on a twenty-year cabinet set.

KraftMaid makes a good cabinet. Set it next to what was sold in the same decade by other brands and you’ll usually see thicker box material and better glides. Our job is to keep the good parts and fix the parts that climate and daily use have worn down.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our KraftMaid Kitchen Remodeling Process

  1. 1
    Walk-through and written price. We look at the cabinets, counters, plumbing, and layout, and we listen to how your family actually uses the kitchen. Every estimate is a written price before any work starts, so you know the number before the crew touches anything.
  2. 2
    Diagnose. Which KraftMaid series is in the house, whether the failure is structural or cosmetic, and whether we’re keeping or replacing the box. This is the part that saves money when it’s done right and costs twice as much when it’s skipped.
  3. 3
    Parts decision. OEM keeps any remaining KraftMaid warranty intact where applicable; a quality aftermarket glide or hinge can be a better long-term bet in some cases. We explain both and let you choose.
  4. 4
    The work. Cabinets, counters, backsplash, flooring, sink and fixtures in a sequence that keeps at least one usable counter and sink as long as possible. Shoe covers and drop cloths at the door, and we ask before moving anything that isn’t ours.
  5. 5
    Check it in place. Doors, drawers, and the counters get opened, closed, and tested before we leave. If a glide is off or a door drags, we fix it the same day.
  6. 6
    Photo of the clean-up. Before the crew leaves, we photograph the clean floor and counters, and you get that photo. If anything is wrong in the first 365 days, the 365-Day Done Right Promise covers it.

What KraftMaid Kitchen Remodeling Costs in Mesquite

A remodeled staircase with wood treads and a slim metal railing

Here’s what these jobs actually run in the valley. Your number depends on kitchen size, door style, and whether you’re keeping the boxes.

Project Typical Cost
Full Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000

What moves the price: cabinet box condition, counter material (Silestone runs less than Cambria in most styles), tile choice for the backsplash, and whether plumbing or electrical has to move. Call (833) 620-6606 for a written price on your kitchen. The estimate is free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Mesquite Homeowners Call Elmstead Remodeling Mesquite for KraftMaid Work

Because the crew that shows up is background-checked, uniformed, and answers the door with the same care they’d want in their own house. Because the price they gave you in writing is the price you pay, with no surprise lines after the crew arrives. Because shoe covers and drop cloths aren’t an add-on here, and neither is the photo of the clean-up.

Our technicians have up to 21 years of experience on KraftMaid kitchens and the brands that surround them, from Kohler sinks and Moen and Grohe fixtures to Cambria, Silestone, and Toto. If KraftMaid has discontinued a line, we say so and offer a match or a custom return rather than pretending a seam isn’t there. We’re an Elmstead Remodeling location, a Cedarwell company, and every completed project carries the 365-Day Done Right Promise: if it isn’t done right, we make it right. Call (833) 620-6606 and a live person picks up.

FAQs

A low-threshold walk-in shower with a bench and grab bar

Contact Elmstead Remodeling Mesquite

If you’re planning KraftMaid kitchen remodeling in Mesquite, or you already own a KraftMaid kitchen and it’s time for a change, call (833) 620-6606 for a free estimate. A live person answers, day or night. We’ll walk your kitchen with you, give you a written price, and tell you plainly what’s worth keeping and what isn’t.

Written by the team at Elmstead Remodeling Mesquite, serving Mesquite and nearby areas.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A whole-home remodel with the living, dining and kitchen areas opened upA wide opening with a new beam where the kitchen wall was removedA remodeled hall bathroom with subway tile and a floating vanityA remodeled primary suite with built-in wardrobes and a window seatA garage converted into a guest room and home officeA remodeled hall bathroom with patterned floor tile and painted walls

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Elmstead in Mesquite

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Mesquite team

A local vetted partner works across Mesquite and the towns around it, to the same written standard as every Elmstead job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (833) 620-6606
Local Service Coverage

Request a Free Estimate in Mesquite

Tell us what you need - Elmstead Remodeling Mesquite responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch