







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Bunkerville
If you’re planning a bathroom remodel in Bunkerville, NV, the work usually runs $9,000 – $28,000 for a full room and $5,000 – $12,000 for a small one, with a written price in hand before anything gets torn out. We work on the older ranch homes and owner-built houses off the Virgin River corridor, and we know what’s behind those walls is rarely what the last remodel left behind. That matters more here than in a new subdivision. When you’re ready to talk, call (833) 620-6606 and a live person picks up, day or night.
Why Elmstead Remodeling Mesquite Is Bunkerville’s Preferred Bathroom Remodeling Company

Bunkerville is small enough that a reputation here travels fast, and ours is built on how we leave a house, not just how the tile looks when we’re done. Families with kids and pets hire us because we put down drop cloths and shoe covers on every visit, ask before we move anything, and run quiet tools during nap and school hours where we can. That’s the Cedarwell Care Promise in plain terms.
The 365-Day Done Right Promise backs every completed project. If something isn’t right after we’ve finished, we make it right, and that commitment is stamped on the job. Every price we give is written before work starts, so the number you approve is the number you pay.
We answer the phone 24/7 with an actual person, not a voicemail box. And because Bunkerville sits off the beaten path, we plan the schedule around the drive and the heat rather than pretending it’s a quick city trip. Our technicians have up to 21 years of experience, and that shows most when a wall comes open and the framing isn’t square. Call (833) 620-6606 for a free estimate.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Small Bathroom Remodel in Bunkerville
A Small Bathroom Remodel in Bunkerville often means working inside a compact footprint in one of the settlement-core homes or mid-century ranches, where every inch gets used and the plumbing stack can’t move far. The job usually covers a new vanity, a refreshed shower or tub surround, updated waterproofing, tile, and fixtures, done in a tight space without turning the rest of the house upside down. Homeowners here call us when the room is dated, the floor feels soft near the tub, or a single bathroom has to serve a growing family. A typical small remodel in Bunkerville runs $5,000 – $12,000, and a new vanity on its own is $800 – $3,000. We give you the line-item price in writing before we start.
Working inside a tight footprint
Small rooms leave no room for a sloppy layout. We measure the actual clearances and plan the fixture placement so a new Kohler or Moen shower valve and trim don’t crowd the door swing. Where the framing is out of square, we fix it rather than hiding it behind a thicker tile bed.
Keeping the rest of the house usable
Most Bunkerville households don’t have a spare bathroom to fall back on, so we sequence the work to keep water and a toilet available as long as possible. Drop cloths go down on the path through the house, and we clean up before the crew leaves each day.
Shower Remodel in Bunkerville

A Shower Remodel in Bunkerville usually starts with a surround that was tiled directly over drywall or a pan that’s leaked quietly for years, and the fix is proper waterproofing, a solid substrate, and a shower that drains the way it should. Homeowners here call us when the caulk keeps failing, the grout won’t stay put, or they’re ready to swap a tub for a walk-in. Walk-in shower installation in Bunkerville runs $4,500 – $12,000, a tub-to-shower conversion is $3,500 – $10,000, and a shower replacement alone is $3,000 – $8,500. We price the waterproofing and substrate work up front so there’s no surprise when the old pan comes out.
Waterproofing that holds up
The pan and walls are where showers fail. We use modern waterproofing systems, and if the subfloor under the old pan has softened from years of slow leaks, that repair gets priced in writing before we close the walls back up. Getting this right the first time is why the leak doesn’t come back next season.
Glass, tile, and fixtures
A frameless glass enclosure opens up a small Bunkerville bathroom without adding square footage. We set tile on a flat, properly cured substrate and hang Kohler or Moen fixtures you can look up by name, with manufacturer warranties that travel with the finished shower.
Trusted Brands We Service in Bunkerville
When you pick materials for a Bunkerville bathroom, we work with names you can research and whose warranties follow the finished room. Cabinets come from KraftMaid and Wellborn, countertops from Silestone and Caesarstone, and fixtures from Kohler and Moen. You can read the spec sheets and the warranty terms yourself before you commit, which is the point. We don’t stock parts locally and we won’t claim to, but ordering through our material partners keeps turnaround reasonable even out here on the river. If a brand matters to you, tell us and we’ll build the quote around it.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Bunkerville Homes
- Leaks that return within a season. Old showers tiled over failed waterproofing and a soft subfloor keep leaking until the pan and substrate are redone properly, not just re-caulked. We fix the cause before new tile goes down.
- Framing and wiring found only after demolition. Older settlement-core homes often hide undersized framing and outdated wiring that a Clark County inspector won’t sign off on. We inspect first and price any concealed repair in writing before the drywall closes.
- Heat-timed failures. Scheduling rough-in and inspection sign-off during 110°F-plus summer afternoons can cause thinset, grout, or stucco patch failures. We plan the work around the heat so curing happens when it should.
- Foundation surprises near the historic core. In Bunkerville’s 1800s settlement core, opening a wall or digging near the slab can turn up original acequia-era ditch lines or water-rights easements that never show on a Clark County plat.
Pricing for Bathroom Remodeling in Bunkerville, NV
Bathroom remodeling in Bunkerville runs $9,000 – $28,000 for a full room and $5,000 – $12,000 for a small one. What moves the number is what’s behind the walls: concealed wiring, undersized framing, failed waterproofing, and the code upgrades a permit triggers once the room is open. We inspect first, write allowances into the contract, and price any real surprise in writing before we touch it, so the quote doesn’t grow after the crew arrives. Every estimate is free and every price is written before work starts. Call (833) 620-6606 to schedule yours.
| Service | Typical Bunkerville Range |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
We Also Serve Cities Near Bunkerville
We also take on bathroom projects outside town, including Mesquite, Moapa Valley, and Moapa Town. The same written pricing, background-checked technicians, and clean-up standards apply wherever the job is. If you’re just outside Bunkerville and wondering whether we’ll travel to you, call and ask. We’ll tell you straight.
Serving Bunkerville, NV – Our Local Coverage Area
We serve Bunkerville and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Bunkerville
Because older Bunkerville homes often hide outdated wiring, undersized or damaged framing, and failed waterproofing that only show up after demolition. We handle that with an inspection first, written allowances built into the contract, and any real surprise priced and approved in writing before we touch it. That way the quote reflects what the room actually needs instead of ballooning later. Call (833) 620-6606 for a written estimate.
Yes, most bathroom remodels in Bunkerville that move plumbing, electrical, or structural elements require Clark County permits and inspection sign-off. Bunkerville is unincorporated, so the county handles permitting rather than a city office, and on rural parcels that process can look different from a Las Vegas Valley subdivision job. We walk you through what needs a permit before work starts. Call (833) 620-6606 to talk it through.
It can. In Bunkerville’s 1800s settlement core, original acequia-era ditch lines and water-rights easements still run through parts of town and often don’t appear on a Clark County plat. When a job involves ground work near the slab, we account for that possibility up front so a surprise doesn’t stall the project. Call (833) 620-6606 if you’re near the historic core and want to plan around it.
Summer highs routinely top 110°F, so we time rough-in, thinset, grout, and stucco patch work for the cooler parts of the day or for breaks in the weather. Heat-timed failures are real and lengthen the punch list, so scheduling around them saves headaches. That planning is part of how we keep a shower remodel on track. Call (833) 620-6606 to schedule your free estimate.
Through our material partners you can choose cabinets from KraftMaid and Wellborn, countertops from Silestone and Caesarstone, and fixtures from Kohler and Moen, all with manufacturer warranties you can verify. You can research each product and its warranty before the order goes in. If a specific brand matters to you, tell us and we’ll build the quote around it. Call (833) 620-6606 to get started.
Bathroom remodeling in Bunkerville starts with a conversation, and it’s free. Call (833) 620-6606 to schedule your estimate, and we’ll bring the written price, the drop cloths, and a plan for how we’ll leave your home better than we found it.
Written by the team at Elmstead Remodeling Mesquite.











